After weeks of planning and sketching...pulled the trigger on plumbing in the new sump.
It is based off the WOW Factor filter thread. I have not built the large purigen reactor yet, but that will be on the return side where I will use vinyl tubing so it will be easy to cut in.
Everything is isolated with unions and ball valves. I am waiting for a true union ball valve to come in the mail to finish the that upright pice the come off the U.
I am going to incorporate a WC system with bulk head drilled into the lower 1/3 of the display tank and have it dump directly into the sump. Then I close the tank return valve and open the true union valve and it should pump the tank water up to the second floor laundry room.
Day did not start out so well! Went to Home Creepo did get some foam to insult the tank from the cement floor.
I piled a bunch of stuff on top of the sheet and bent into the pickup box. Well the wind got it and threw all my stuff and the foam all over a busy 4 lane street! Luckily it was not busy and I pulled into a parking lot and ran out and got it..but not before it took a couple hits! the PVC pipe got run over too but it doesn't look like it cracked!
I thought man just my luck....the way things are starting out I'll screw up drilling the tank...BUT things went better the rest of the day!