Small update,
This weekend was busy for me. I Moved my rack again to make room behind it for my three 55k barrels so I had to shorten the plumbing and drain all the tanks. I have the barrels prepped for plumbing and bought the pumps needed to evacuate the waste water out of the house and pump the aged water into the needed tanks. I also painted half the room while the rack was out of the way which was needed. I placed a order for some 1'' uniseals and hope to have them plumbed this weekend. I am doing all this in an effort to make changing the water easier and more efficient, I am sick of lugging 5g buckets up and down the stairs to do water changes on the smaller tanks. Also I will have 110 gallons of aged water ready for the 240 and the other smaller tanks. I will no longer have to run a hose out to the yard in the winter to drain the tanks I'll just be able to drain it into one of the barrels that will pump it into the gutter drain. I will probably add some timers and such to help automate the process but I will get to that later.